How Much Does It Cost to Dig a Pond in Florida?

National cost guides put the cost to dig a pond at about $1.50 to $4.00 per cubic yard. Those rates are for larger, deeper ponds. By the acre, one guide lists $3,000 to $15,000 for ponds under 10 acres. A quarter-acre pond runs $1,800 to $8,100 in that guide.

An excavator with an operator runs $100 to $300 an hour in one guide. Most operators charge a one-day minimum. Every price here is a market number from a published guide, not our price list. For a pond on your own lot, start with our pond construction page.

What does it cost to dig a pond per cubic yard or per acre?

Small backyard ponds are priced by the square foot and typically include synthetic liners, one guide notes. Dug earth ponds are priced by the cubic yard or the acre.

What is pricedPublished market rangeKind of source
Digging a larger pond, per cubic yard$1.50 to $4.00, or $1.50 to $3.50 in a second guidetwo national cost guides
Digging only, an average backyard pond$300 to $3,200a national cost guide
Pond under 10 acres, per acre$3,000 to $15,000a national cost guide
Quarter-acre pond$1,800 to $8,100a national cost guide
Half-acre pond$2,400 to $11,600a national cost guide
Farm pond$3,000 to $23,000a national cost guide
Fishing pond$7,000 to $59,000a national cost guide
Excavator with an operator, per hour$100 to $300a national cost guide
Excavator with an operator, one 8-hour dayabout $800 to $2,400math on that hourly range
Mini excavator rental, machine only, per day$200 to $700a national cost guide
Hauling dirt away, per cubic yard$140 to $230a national cost guide
Cut and fill on the same lot, per cubic yard$1 to $15a national cost guide

One guide says larger ponds typically cost less than smaller ones per cubic yard. Digging 1,000 cubic yards at $1.50 to $4.00 a yard comes to $1,500 to $4,000. On a small dig, one guide’s $500 to $800 minimum project fee can set the floor.

What does an excavator with an operator cost?

Most excavation contractors charge by the cubic yard or by the project, one guide says. Some charge by the hour for small jobs, at $100 to $300 an hour for an excavator with an operator. Most operators charge a minimum of one day or eight hours, so a day runs about $800 to $2,400.

What raises the pond digging cost on a Florida lot?

  • Size and depth. One guide says larger, deeper ponds require more equipment, labor and materials. The extension service says ponds in Florida should be at least 6 to 8 feet deep.
  • The water table. The extension service says dug ponds work well in areas with naturally high water tables. Myakka sand is a Florida flatwoods soil. Federal soil surveys put its water table less than 18 inches down for 1 to 4 months most years. Digging below that line means digging in water.
  • Wet ground. One guide prices heavy or wet soil at $10 to $15 a cubic yard. Light soil runs $2.50 to $6. The local weather service office in Melbourne names June through September as the wettest months.
  • Sandy soil. The extension service warns that soils high in sand or gravel may have excessive seepage. One guide says sandy soils are not ideal for ponds and may need clay-heavy soil added.
  • Clearing the spot first. Trees, palmettos, stumps and roots come out before the digging starts. One guide says fees go higher when stumps, trees and boulders must be removed before digging. See what land clearing costs per acre.
  • Access. One guide says labor costs more when trucks and large machines struggle to reach the site. Prices also rise when heavy machinery must be hauled to a remote location.
  • Dewatering. Pumped water needs a legal place to go. Outside city limits, Brevard County’s code bars pumping or draining pond water onto surrounding parcels without permits. A county-maintained stormwater system falls under the same rule. The permits it names are county, St. Johns River Water Management District dewatering or other permits.

Should the dirt stay on the lot or be hauled off?

One guide says costs increase when dirt is trucked to or from the site instead of moved on site. It puts hauling dirt away at $140 to $230 per cubic yard, or $1,400 to $2,300 per 10-yard truckload. Another guide puts haul-off at $105 to $175 per cubic yard.

Pond dirt can raise a house pad or low ground on the same lot. One guide puts residential cut and fill at $1 to $15 per cubic yard. Buying fill dirt runs $5 to $25 a yard there. Spreading and grading that fill is excavating and dirt work.

Which Brevard County rules change the price of a pond?

Outside city limits, Brevard County’s code sets the rules below. Inside a city, the city’s planning office answers the permit question.

  • Permit line. The county requires a private lake permit once a parcel’s private lakes reach three-quarters of an acre. The rule covers ponds up to ten acres whose dirt stays on the parcel.
  • Smaller ponds. A pond under three-quarters of an acre needs no private lake permit. It still follows the code’s locational, vegetative and construction requirements.
  • Slopes and depth. The private lake rules cap side slopes at 5 feet across for every 1 foot down. That slope runs to a normal water depth of at least five feet, 25 feet out from the water’s edge. No part may sit deeper than 12 feet below the mean water level.
  • Haul-off. When the dirt leaves the parcel, the land alteration rules apply instead. Even a dig under three-quarters of an acre then needs that permit if it holds water deeper than six feet. Those rules exempt minimal fill for house pads, septic systems and roads built with an approved building permit.

A gentle bank means a wider hole and more dirt to move. Our site preparation planning walks you through which permits apply to your lot and what the county asks for.

Do you need to call 811 or check for wetlands first?

Yes to 811. Florida’s one-call law requires notice to Sunshine 811 at least 2 full business days before any excavation. The call checks for underground utility lines before the digging, one national guide notes.

Florida’s rules require an environmental resource permit before any project in, on or over wetlands or other surface waters. Ask the water management district before digging in a wet spot.

How do you get a real number for your pond?

Your own number comes from your lot: the soil, the water, the access and where the dirt goes. We dig earth ponds on lots and acreage around Melbourne and Brevard County with a rented excavator. That includes fill ponds that raise a house pad, farm and stock ponds, and fishing ponds. Clearing comes first, roots and all.

We look at the spot and where the dirt will go, then put a free quote in writing. Start on our pond digging and excavation page, or call or text (904) 719-0443.

Frequently asked questions

How much does it cost to dig a pond per acre?
One national cost guide lists $3,000 to $15,000 per acre for ponds under 10 acres. Another puts farm and fishing ponds priced by the acre at $2,000 to $25,000. The first guide says smaller lakes cost more per acre because of equipment and material transport costs.
What is the pond excavation cost per cubic yard?
For a larger pond, one guide lists $1.50 to $4.00 per cubic yard and another lists $1.50 to $3.50. General excavation runs $2.50 to $15.00 per cubic yard in the first guide. Light soil sits at the low end and heavy or wet soil at the high end.
What does an excavator with an operator cost per day?
One national guide lists $100 to $300 an hour for an operator with a machine. Most operators charge a minimum of one day or eight hours, so a day runs about $800 to $2,400. Renting a mini excavator alone runs $200 to $700 a day in the same guide.
How deep should a pond be in Florida?
The extension service says ponds in Florida should be at least 6 to 8 feet deep. Outside city limits, Brevard County's code caps a private lake at 12 feet below the mean water level. Each extra foot of depth is more dirt to dig and place.
Does sandy soil hold pond water?
It depends on the water table. The extension service says dug ponds work well in areas with naturally high water tables. It also warns that soils high in sand or gravel may have excessive seepage. One national guide says sandy sites may need clay-heavy soil added.
Do I need a permit to dig a pond in Brevard County?
Outside city limits, Brevard County requires a private lake permit once a parcel's ponds reach three-quarters of an acre. That covers ponds whose dirt stays on the parcel; smaller ones still follow the code's location, vegetation and construction rules. Work in, on or over wetlands needs an environmental resource permit. Inside a city, ask the city's planning office.
Is this what BW Clearing charges?
No. These figures are market numbers from national cost guides, not our price list. We look at the lot and put a free quote in writing. Call or text (904) 719-0443.
Request a Quote

Get In Touch With BW Clearing

Send us the location and what you want cleared, and we will reach out to set a time. You can also call or text (904) 719-0443.

  • Call or text (904) 719-0443
  • Serving Melbourne, FL, the Space Coast and the Treasure Coast
  • Free written quotes · land clearing, mulching and dirt work

Request a Quote

Tell us about the lot or acreage, the work you need and where it is. We look at the job and put a free quote in writing.

Call (904) 719-0443