Gopher Tortoise Relocation: What Does It Cost in Florida?
If every bit of clearing, grading and equipment staging stays at least 25 feet from every gopher tortoise burrow, you may not need a permit. That is the Florida Fish and Wildlife Conservation Commission (FWC) rule. If any work has to go inside 25 feet, the order is set: a 100 percent burrow survey, then an FWC permit, then the work.
FWC’s 2026 mitigation table starts at $280 for a 10 or Fewer Burrows permit. Moving tortoises off the lot adds an agent’s fee and a recipient site fee. Business press in 2025 put recipient sites at $5,000 to $6,000 per tortoise. Clearing first can turn the job into a disturbed site permit, which adds $2,096 to $5,590 per tortoise. These are agency and market numbers, not our price list. Lot and acreage clearing starts after the survey and any permit, or with every machine kept 25 feet from each burrow.
When does a gopher tortoise burrow need a permit?
FWC requires a relocation permit before anyone disturbs burrows or starts construction (Rule 68A-27.003, F.A.C.). A disturbance includes any type of work within 25 feet of a burrow. The gopher tortoise stays state-listed as Threatened in Florida, and state law protects tortoises and their burrows.
FWC says you may not need a permit if all development work avoids burrows and tortoises by at least 25 feet. That covers planned vegetation clearing, grading or ground leveling, construction and heavy equipment staging. Routine yard maintenance and landscaping that do not harm tortoises or collapse burrows need no permit.
Farm, forestry and wildlife management work done under FWC’s Gopher Tortoise Enforcement Policy needs no permit either. That list is tilling, planting, harvesting, prescribed burning, mowing, disking, roller chopping and tree cutting. Clearing a lot to build is not one of them. Permit or not, FWC says temporary exclusion fencing (black fabric or silt fencing) should keep tortoises out of work areas.
How does the gopher tortoise survey work?
A 100 percent burrow survey of the entire development area comes first. The surveyor follows straight, parallel lines spaced no more than 33 feet apart, closer in dense growth. The lines cover the whole development area and 25 feet beyond the planned work.
A landowner can do the survey for a 10 or Fewer Burrows permit, or hire an authorized agent. FWC recommends an agent for larger or thickly vegetated properties. One agent quoted in 2025 business press put the survey at about $200. The same report says the cost of moving tortoises varies with the size of the property and the number of burrows.
Which FWC permit fits your lot?
- 10 or Fewer Burrows permit. It runs 1 year with a $280 mitigation contribution. After FWC’s e-learning course, a landowner or a registered agent can move tortoises on-site. FWC allows a registered agent only two of these permits in total.
- Conservation permits. These cover more than 10 burrows. The contribution is $280 for the first 10 burrows (up to five tortoises), then a per-tortoise amount for each one after.
- Disturbed site permit. This one applies when burrows were already disturbed without a permit. An authorized agent must do the survey, the capture and the relocation.
How much does gopher tortoise relocation cost?
FWC’s mitigation table is adjusted for 2026. The contribution is the same whether tortoises move on-site or off-site. Off-site moves add an authorized agent, who charges a fee, and a recipient site, which charges a fee to accept tortoises.
| Cost line | Amount | Where the number comes from |
|---|---|---|
| 10 or Fewer Burrows permit, 1 year | $280 | FWC 2026 mitigation table |
| Conservation permit, first 10 burrows (up to five tortoises) | $280 | FWC 2026 mitigation table |
| Conservation permit, each additional tortoise | $419 to $4,193, by recipient site type and tier | FWC 2026 mitigation table |
| Tortoise moved to an unprotected recipient site | $7,545 per tortoise | FWC 2026 mitigation table |
| Disturbed site add-on, single-family property owner | $2,096 per tortoise | FWC 2026 mitigation table |
| Disturbed site add-on, all other owners | $5,590 per tortoise | FWC 2026 mitigation table |
| Temporary exclusion, under 2 months | $140 per tortoise | FWC 2026 mitigation table |
| Temporary exclusion, 2 to 4 months | $280 per tortoise | FWC 2026 mitigation table |
| Temporary exclusion, 4 to 6 months | $419 per tortoise | FWC 2026 mitigation table |
| Burrow survey (one agent’s figure) | about $200 | 2025 business press |
| On-site relocation (one agent’s figure) | $8,000 to $10,000 | 2025 business press |
| Backhoe capture of tortoises | $3,500 to $5,000 a day | 2025 business press |
| Off-site recipient site fee | $5,000 to $6,000 per tortoise | 2025 business press |
The per-tortoise amount for conservation permits starts at $419 for a long-term protected area at tier 1. It tops out at $4,193 for a short-term protected area at tier 3. The same 2025 report says the recipient site price has almost tripled since the pandemic. Most recipient site permits allow at most two tortoises an acre, or up to four on long-term and research sites.
Why does the survey come before the machines?
Clearing first can turn a simple permit into a disturbed site permit. That permit adds $5,590 per tortoise to the standard mitigation. Sites owned by a single-family property owner add $2,096 per tortoise instead.
FWC will not issue a disturbed site permit until any law enforcement investigation and legal proceedings are complete. FWC asks for a complete application at least 90 days before it is needed, and most are processed in 45 days or less. An authorized agent must handle the survey, capture and relocation on that permit. That is why the survey comes before the machines.
What drives the cost on your lot?
- Burrows and tortoises. Past the first 10 burrows, each extra tortoise adds a per-tortoise amount.
- On-site or off-site. FWC says on-site relocation is more economical when suitable habitat remains after development. The on-site area needs at least 750 square feet of suitable habitat, at least 10 feet wide. Half of it must sit at least 25 feet from construction boundaries.
- The recipient site. Its type and tier set the FWC amount, and the site charges its own fee.
- Capture method. Backhoe capture is priced by the day in the report above.
- Ground cover. Thick growth means survey lines closer than 33 feet, and FWC recommends an agent there.
- Timing. A disturbed site permit waits on any investigation, and FWC asks for that application 90 days ahead.
When can land clearing start on a lot with burrows?
Land clearing starts after the survey and any permit, or with every machine kept 25 feet from each burrow. The landowner or an authorized agent handles the survey and any move. Where burrows stay, forestry mulching can take down growth outside the 25-foot buffers. Our site preparation planning sets what stays and what goes before the machines run. The Brevard County land clearing permits guide covers the county and city rules.
When the lot is ready, start on our lot and acreage clearing page. We look at the lot and put a free quote in writing. Call or text (904) 719-0443.